Build cost: index, regional factor, estimate
build_costBuild cost for a scheme: the sector's cost index with its 1- and 5-year
movement, the regional location factor (`region`: NATIONAL, LONDON,
SOUTH_EAST — an error lists what is loaded), the editorial on-cost
percentages (prelims, contingency, overheads & profit, professional fees)
and, given `gia_m2` and `rate_gbp_m2` (your BCIS or in-house base rate,
with `rate_period` in the series' own format, e.g. 2024Q1), an estimate:
the rate carried through the index to the latest period, localised,
multiplied out, with totals at low / mid / high on-costs. The £/m²
benchmark leg says `not_available` until a tender benchmark is loaded —
no rate is invented, and nothing here is a modelled number.
UK only. Free.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"sector": "<sector>"
},
"name": "build_cost"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| basis | No | tender | |
| gia_m2 | No | ||
| region | No | NATIONAL | |
| sector | Yes | ||
| rate_gbp_m2 | No | ||
| rate_period | No |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||