Mechanics Lien Notice and Filing Dates

lien_deadline_dates
Read-onlyIdempotent

Count mechanics lien (construction lien) notice and filing deadlines from the dates of a job. Send the last day you furnished labor or materials (and, if a step needs them, the first day, the date an owner's notice of completion or termination was recorded, or the date your lien was recorded), plus each step with the count YOUR state's statute gives: a number of days, a number of months, or a day of a later month (the Texas form '15th day of the 3rd month after the month the work was done'). Get back each deadline, its weekday, whether it falls on a weekend or US federal holiday, the next business day if you say your state extends such deadlines, and, with as_of, the days left or the days past. The tool does not know any state's counts: you send them. Answer fields: ok, verdict, result, rule, does_not, sources, observation, signature, verify. Errors: ok false with the reason (bad input, too large, hourly limit). Free. No model, no network, nothing you send is stored by the tool, and every answer is signed with LLPRO's key (check it at https://llpro.ai/lien-deadline-dates). Not legal, tax or financial advice.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "last_work_date": "<last_work_date>",
      "steps": "<steps>"
    },
    "name": "lien_deadline_dates"
  }
}

Input Schema

NameRequiredDescriptionDefault
as_ofNoOptional: today's date (or any date), YYYY-MM-DD, to get days left or days past for each step.
stepsYesThe deadlines to count (1 to 20), each with the count your state's statute gives.
extra_holidaysNoOptional: your state's legal holidays that are not US federal holidays (up to 40 dates). They count as non-business days.
last_work_dateYesLast day labor, services or materials were furnished to the job, YYYY-MM-DD.
first_work_dateNoFirst day labor, services or materials were furnished (for preliminary-notice steps counted from the start), YYYY-MM-DD.
lien_recorded_dateNoDate your lien was recorded, if a step counts from it (an enforcement suit deadline, for example), YYYY-MM-DD.
weekend_holiday_ruleNonone (default): the deadline stays on the counted day, even a weekend or holiday. next_business_day: only if YOUR state's time-computation statute extends a deadline that falls on a Saturday, Sunday or legal holiday.none
completion_notice_dateNoDate the owner's notice of completion, cessation or termination was recorded, if a step counts from it, YYYY-MM-DD.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4.4/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover the read-only, closed-world, idempotent profile, and the description adds real context beyond them: free, no model or network, nothing stored, answers signed with LLPRO's key (with a verification URL), and explicit error modes (bad input, too large, hourly limit). It also lists the response fields. A 4 rather than 5 because the signing/verification claim is repeated in the field list and the 'too large' limit is only referenced, not quantified in the description.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the purpose, then inputs, then outputs, then trust/limits — a sensible order with dense, mostly non-redundant sentences. It is long for a single description and the answer-field enumeration plus repeated signature mention add bulk a reader must wade through, though no clause is plainly filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For an 8-parameter tool with no output schema, the description still tells the agent what comes back (deadline, weekday, weekend/holiday flag, next business day, days left/past with as_of), how failures surface, and the trust model. Nothing needed to invoke it correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

With schema coverage at 100%, the schema already documents every parameter, so this only needs to add meaning — and it does, by translating statute language into the unit/count/day_of_month shape with the concrete Texas '15th day of the 3rd month after the month the work was done' example. That helps an agent map real statute text onto the enum correctly, which is more than the schema alone conveys.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a precise verb and resource ('Count mechanics lien (construction lien) notice and filing deadlines') and nails the scope boundary that separates it from deadline calculators that bake in their own rules: 'The tool does not know any state's counts: you send them.' An agent can tell what this does and what it does not do without opening the schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives clear operating guidance — send the last furnished date plus each step with your state's statute count, and optionally the first-work, completion-notice, or lien-recorded dates when a step counts from them — which maps directly to when each parameter is needed. It does not explicitly route to or away from named sibling calculators, so it stops short of the top mark.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.