Skip to main content
Glama

Update a scheduled task

update_scheduled_task
DestructiveIdempotent

Patch a scheduled task's name, prompt, schedule, skip-guard, or enabled state — only the fields passed are changed. To change the schedule, set interval/time/timezone together (plus weekday or dayOfMonth as the interval requires). This tool calls the SHIP API, documented at https://letsship.ai/docs/api. Requires the config:write capability.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
nameNo
timeNo24-hour wall-clock time in `timezone`, e.g. '09:00'.
labelsNoTracker label names put on every issue this scheduled task files (replaces the list; [] clears it). The label must ALREADY exist in the project's tracker team — the platform attaches labels but cannot create them, so a name the workspace does not have is dropped.
promptNoReplaces the issue description verbatim
enabledNoSet false to pause the schedule without deleting the scheduled task
weekdayNoDay of week — required when interval is 'weekly'.
intervalNoFire cadence. 'weekly' requires weekday; 'monthly' requires dayOfMonth.
timezoneNoIANA timezone id, e.g. 'Europe/Amsterdam'.
dayOfMonthNoDay of month, 1-28 — required when interval is 'monthly' (capped at 28 so every month has the day).
scheduledTaskIdYesScheduled task id to update
skipIfPreviousOpenNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

Score is being calculated.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.