Set action plan
hypotize_experiment_action_plan_setReplace the whole action plan of an experiment: the task list to run the test, each item with title, estimated_hours, optional assignee_id and completed. It is the only tool that edits the action plan; hypotize_experiment_update does not touch it. Send every item to keep: pass the id of an existing item to keep it, leave id out for a new one, and items left out are removed. Assignees must be members of the project. Returns the plan and its total hours. Changes the experiment updated_at; optimistic concurrency (STALE_EXPERIMENT). Requires the editor or owner role in the project; a contributor or viewer gets INSUFFICIENT_ROLE with required_roles.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| items | Yes | ||
| experiment_id | Yes | ||
| idempotency_key | Yes | ||
| expected_updated_at | Yes |