Estimate Render Cost
estimate_costEstimate the maximum credits a render would cost (only clip generation is billed, ~1 credit per rendered second; failed renders are refunded in full). For regenerate_scene pass the chosen scenes' total duration. Returns the most the render can cost.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| scene_count | No | Number of scenes, if known (e.g. from get_video). | |
| single_scene | No | True for a single-scene video (create_video single_scene=True; capped at 11s). | |
| duration_seconds | Yes | Seconds to render: the video's length, or for regenerate_scene the chosen scenes' total duration_seconds (from get_video). |