Get AI power sites, deals and supply
al.power.getAI data-center sites with planned and running gigawatts and where their power comes from, chip and cloud deals sized in gigawatts (never added to sites), and power supply deals tied to AI buyers (gas, nuclear, solar, fuel cells). With a query, only rows involving that entity.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "al.power.get"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| query | No | Name, ticker or id. Omit for everything. |